|
Magnolia Ridge Pump Station
- Grant Award: $5,648,301.00
- Project Total: $10,128,322.63
- Grantor: DHS/FEMA/GOHSEP โ Hazard Mitigation Grant Program
- Constructed a new drainage pump station
|
 |
|
Paradis Canal Gate
- Grant Award(s) total: $3,133,451.11
- Project Total: $4,975,799.34
- Grantor(s): Delta Regional Authority, Coastal Protection Restoration Authority RESTORE Act Matching Opportunities Program, and RESTORE Act
- Constructed a new flood control structure including a vertical lift gate and screw jack system to reinforce the concrete T-Wall, levee tie-ins, and electrical power distribution.
|
|
|
Magnolia Ridge Levee & Roadway Improvements
- Grant Award: $2,373,193.53
- Project Total: $2,373,193.53
- Grantor: Coastal Protection Restoration Authority Program (CPRA)
- Upgraded and raised the existing levee
|
 |
|
LA 52 Improvements Phase I (Blueberry Hill to Angus)
- Grant Award: $8,325,290.33
- Grantor: FHWA โ DOTD โ Urban Systems
- Removed and replaced existing roadway, constructed a sidewalk and shared-use path, and installed subsurface drainage, lighting, and landscaping along Paul Maillard Road.
|
 |
|
Ellington Pump Station
- Grant Award(s): $5,681,368.70
- Project Total: $8,235,959.95
- Grantor: DOTD Statewide Flood Control Program
- Construct a new pump station near Primrose St.
|
 |
|
Kellogg T-Wall
- Grant Award: $2,500,000.00
- Project Total: $4,361,489.94
- Grantor: Coastal Protection Restoration Authority Program (CPRA)
- Construct a new T-Wall and extend pump station discharge pipes through the T-Wall.
|
|
|
Wastewater Lift Station Generator Project & Sewer Lining
- Grant Award(s): $10,314,053.00
- Grantor: US Department of Treasury
- Replaced sewer lining throughout the Parish and installed generators at priority lift stations
|
 |
|
Ama Drainage Improvements
- Grant Award: $1,000,000.00
- Project Total: $2,833,676.85
- Grantor: State of Louisiana Department of Treasury
- Constructed a new pump station and tie-back system at Ama Pump Station
|
|